Everything a sourcing manager asks for during due diligence, published openly — equipment list, monthly capacity, quality control process and audit certificates. If you want to verify any of it, come and see it, on site or on a video call.
Ask any supplier for this list and compare. Machine counts are the fastest way to tell a real factory from a trading company.
| Circular knitting | 32 machines · single jersey, piqué, fleece, rib · 20–40 in diameter |
|---|---|
| Cutting | 4 automatic spreaders · CAD marker making · 2 CBM cutting tables |
| Sewing | 18 lines · 320 lockstitch, overlock, coverstitch, flatlock and bar-tack machines |
| Special machines | Automated buttonhole, bar-tack, fusing press, 6 double-needle chainstitch |
| Printing | 4-station and 8-colour carousel screen press · 2 DTG printers · sublimation calender |
| Embroidery | 12-head machine, up to 12 colours, 300 × 200 mm field |
| Washing | Partner dyehouse next door · 6 industrial washers for garment and enzyme wash |
| Finishing | 12 steam press stations · needle and metal detector on every packing line |
| Pattern & sample room | 9 pattern makers and sample machinists · separate sample line so bulk is never delayed |
| Product family | Monthly capacity | Typical bulk lead time |
|---|---|---|
| T-shirts & polos | 28,000 pcs | 30–35 days |
| Hoodies & sweatshirts | 22,000 pcs | 35–45 days |
| Sportswear & activewear | 18,000 pcs | 35–40 days |
| Woven shirts & blouses | 14,000 pcs | 40–45 days |
| Workwear & uniforms | 12,000 pcs | 40–50 days |
| Kids & babywear | 16,000 pcs | 35–40 days |
Capacity is shared across families, so a single order is rarely limited by the numbers above. Peak season (August–November) books out early — confirm your slot in advance.
Our QC team reports to the Quality Manager, not to production. That single line on the org chart is the difference between a real QC system and a formality.
The defect rate we hold ourselves to is under 2.1% across a rolling 12 months. If a shipment arrives outside spec, we replace or credit — that clause is written into our order confirmation, not just promised in an email.
We would rather show you the paperwork than claim it. Every certificate below is current, and we will send the PDF with its validity dates.
Amfori BSCI social audit covering working hours, wages, safety and freedom of association. Latest audit report available with the full corrective action plan.
Social compliance
Worldwide Responsible Accredited Production certification, covering lawful, humane and ethical manufacturing conditions.
Social compliance
Two-pillar SMETA audit with labour standards and health and safety modules, published to our Sedex profile so you can review it directly.
Social compliance
Quality management system certification covering documented procedures from order intake to final inspection and corrective action.
Quality management
Tested for harmful substances at product class II and III level. Certificate numbers are issued per fabric and can be passed to your customer.
Product safety
Global Organic Textile Standard for organic cotton programmes, with transaction certificates issued for each shipment when required.
Organic certification
Restricted substance documentation for the EU and children's product safety documentation for the US, prepared per order when your market requires it.
SGS, BV, Intertek, TÜV or your own QC team are welcome on the floor at any stage of production. We will book the slot and give them access to the lines.
A factory tour is the fastest way to get past the sales pitch. We will walk you through the sewing hall, the cutting room and the QC station, live, and answer whatever your team asks.
Visiting in person? We will arrange the invitation letter for your visa and pick you up from Shenzhen or Guangzhou.